The need for a calibration of the HDM model to local condition is therefore an essential component of the pavement management process. IIEST, Civil Engineering Department, Shibpur, West Bengal, IndiaĬalibration, HDM calibration, level-1 calibration AbstractĪdequate budget allocation would require the HDM-4 model to generate good prediction of the actual pavement deterioration behavior.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |